Skip to content

Data Center Migration & Project Support

End-to-end project support throughout the complete deployment lifecycle.

Overview

From first delivery to final decommissioning, we provide the field teams for data center build-outs, expansions, migrations and refreshes.

Teams are sized to the project, and every phase is documented.

Projects at a glance

  • LifecycleDelivery through to decommissioning
  • ProjectsBuild-outs · migrations · refreshes
  • TeamsSized to the project
  • MethodApproved MOPs · documented handover

Project Lifecycle

  1. DeliveryEquipment received on site
  2. StagingPrepared and checked before install
  3. InstallationRacks and devices installed
  4. CablingFiber and copper connected
  5. TestingLinks and devices verified
  6. DocumentationAs-built records completed
  7. OperationsDay-to-day on-site support
  8. MaintenancePlanned work and replacements
  9. DecommissioningEquipment removed and logged

Projects

Project Types We Support

  • Data center build-outs
  • Data center expansions
  • Network deployments
  • Server deployments
  • Fiber backbone projects
  • Structured cabling projects
  • Network migrations
  • Hardware refresh projects
  • Decommissioning projects
  • Rack remediation
  • Cable remediation
  • Emergency deployments
Engineer checking a project support checklist in a new data hall

Moves planned in waves, tracked against a schedule

How We Engage

Project work usually starts with a short call about the site, the scope and your timeline. From there:

  1. Scoping call: site, scope, dates and access rules
  2. Site review and MOP check where needed
  3. Team size and schedule agreed with you
  4. Delivery, with documentation at handover

Before we start

  • SiteLocation and access rules
  • ScopeEquipment, cabling and work required
  • TimingPreferred dates and work windows
  • ProceduresYour MOPs, SOPs and change process

Have a data center project?

Call now +49 163 4735985